产品中心
Home > Products > Hydrocyclone > Hydrocyclone Lining

Hydrocyclone Lining

    Hydrocyclone Lining

    Installation Methods: Adhesive Method: The ceramic liner can be installed under normal temperature conditions by adhesively bonding it to the inner wall of the hydrocyclone using a special adhesive. This method is simple to use and low-cost. Stud Welding Method: For higher temperature conditions, stud welding can be used. First, studs are welded to the inner wall of the hydrocyclone, and then the ceramic liner is secured to the studs.
  • Share:
  • Contact us Inquiry
  • WhatsApp:+8618764326777

The hydrocyclone lining is a crucial component of the Hydrocyclone. Its primary function is to improve the wear resistance of the hydrocyclone and extend the service life of the equipment. The following is a detailed introduction to the hydroCyclone lining:

Safety Operating Procedures


· Pre-operation Inspection

· Check the hydrocyclone and housing lining for any loose particles. If access is required, power off the feed pump.

· Inspect and remove debris from the feed pipe, discharge pipe, and underflow box to ensure unobstructed flow.

· Check that the unit is securely installed, that all connecting bolts are complete and tightened, and that all seals are properly sealed.

· Operators must wear protective equipment such as a hard hat, safety glasses, gloves, and a dust mask.


· Operation

· The pressure on the hydrocyclone feed manifold must not exceed 0.3 MPa. Do not use the hydrocyclone valve to control flow; the feed valve must be fully open.

· Regularly monitor the hydrocyclone liquid level, rotate Hydrocyclones regularly, and check the lining for integrity to prevent damage to the equipment. · Check the hydrocyclone underflow and overflow outlets regularly. If overflow is reduced or absent, determine whether the hydrocyclone overflow pipe is underpressured or severely worn. If necessary, shut down the machine for inspection.

· During operation, ensure the hydrocyclone pressure is stable, the feed pump current changes smoothly, and the incoming feed tank level is stable; it should not be too low.

· During hydrocyclone operation or equipment maintenance, avoid striking or bumping the high-Alumina ceramic wear-resistant lining to avoid damage.


· Stop and Check

· After the hydrocyclone feed pump stops feeding, check the underflow outlet and piping for blockage.

· Recheck the hydrocyclone and tank linings for loose lining and the cast stone in the auxiliary pipeline chute for loose or blocked cast stone.


Key attributes

model

Body diameter (mm)

Height (mm)

Weight (kg)

Material

Inlet pipe diameter (inches)

Overflow pipe diameter (inches)

MHC™100

100

876

8

Full polyurethane

2

2

MHC™150

150

1064

18.5

Full polyurethane

2

3

MHC™250

250

1491

125

Polyurethane + steel shell

4

5

MHC™375

375

1708

210

Polyurethane + steel shell

6

8

MHC™500

500

2001

375

Polyurethane + steel shell

8

10

MHC™650

650

2441.3

800

Polyurethane + steel shell

10

14

MHC™800

800

2943.3

1225 

Polyurethane + steel shell

12

18


ONLINE MESSAGE

Please fill in a valid email address
Captcha Can not be empty

RELATED PRODUCTS

No search results found!
Improve your manufacturing efficiency and quality with our technical ceramics.
Contact Us

Zibo Taili Industrial Ceramics Co., Ltd.

Tel: +86 18764326777

Email: admin@tailiindustrialceramics.com

Address: Liuwa Industrial Park, Kunlun Town, Zichuan District, Zibo City, Shandong Province


Copyright ©  2025 Zibo Taili Industrial Ceramics Co., Ltd  All rights reserved

Sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject